On August 24, the Kautex Windsor plant was struck by an F2 tornado. Once it was confirmed that all employees were safe, the team faced the arduous task of rebuilding and minimizing disruption to the customer.
- Structural engineers confirmed the frame and roof beams were 90% usable/safe
- Chillers / compressor suffered little physical damage
- All blow molding machines and downlines appeared to have little physical damage
- IT servers / switch closets appeared undamaged
- Status of material feed system unknown
- Only one of three transformers was potentially operational
- Standing water and debris littered the floor
- 1000 amp switch panel saturated with water
Kautex immediately contacted its customers, who were faced with difficult decisions: Could they build vehicles without the fuel tanks and install them later? Could they change their product mix? If they had to shut down, how long would be it for? Should they consider moving their tooling to another location?
The initial assessment for the restoration was eight weeks. Eight weeks of lost production and the follow-on impact. Eight weeks of customers juggling their own production schedules – in an environment that simply isn’t that forgiving.
Steve Phillips, Windsor’s Director of Operations, asked the restoration partners to take a second look at the plan. Collectively, they shortened the time from eight weeks to two: a manageable number for the key customers in the plant.
“To begin, we committed the schedule took priority above anything else, except safety,” said Steve. “We worked closely with the local electric company to ensure power could be restored to the building by the end of the first weekend so we could start the reconstruction process. We had work crews on-site 24/7 working clean up, constructing the walls and roof, wiring, plumbing and more. And, we built a ‘plant within a plant’ – securing a production zone for the P1 blow molder behind the walls of the construction zone.
“We involved our customers every step of the way,” continued Steve. At first, it was daily cadence calls twice a day to update them on the status, but they went above and beyond by providing highly trained EHS specialists and advise as well as skilled tradespeople.
“Our first bake test was sponsored by Home Depot,” joked Steve, referencing the first bake test done in an oven purchased at Home Depot (a local home improvement chain). “It was sort of like watching cookies bake in your oven, but not quite so tasty.” (The oven was later cleaned and donated to a charity.)
- The City of Windsor doesn’t have an emergency siren system. For safety reasons, our plant needs to find an alternative solution.
- The list of employees on site during the tornado was on a piece of paper on the supervisor’s desk – which didn’t survive the storm. The electronic time and attendance system should be linked to cell phones so a quick download of those employees / contractors who have swiped into the plant is easily available.
- It was important to educate the restoration company of the timelines in the automotive business. Many restoration companies are used to months-long projects – which simply won’t suffice in the automotive industry.
- Involve the customer early and often as they are a powerful – and influential – resource.
- Plan for setback. Kautex Windsor hit several during their restoration:
- Switches / hand valves were physically moved
- Drive cards in the blow mold computers were not inserted
- Cables were pulled
- Motors, initially thought to be OK, were damaged, as were drive cards, CPUs, and the IT server room
“It’s times like this that you realize the strength of the entire Kautex network,” continued Steve. “We may sometimes feel like an ‘island’ as the only plant in Canada, but the Kautex team pulled through and proved once again that we have a global team that truly wants to collectively succeed.”
Customers awarded the plant certificates of appreciation for its quick recovery, and one customer came on-site to learn from us about the process – and to take away ideas for their own disaster recovery efforts.
About Kautex
Zukunft fahren – bei Kautex. Als ein Tier One-Automobilzulieferer mit mehr als 30 Anlagen in 13 Ländern entwirft, entwickelt und stellt Kautex herkömmliche und Hybrid-Treibstoffsysteme, fortschrittliche Reinigungslösungen für unterstütztes und autonomes Fahren, Motor-Nockenwellen und industrielle Verpackungslösungen aus Kunststoff her. Als Pionier im Design und der Herstellung von Automobil-Treibstoffsystemen aus Kunststoff erweitert Kautex sein Portfolio auf smarte Produkte und datengetriebene Dienstleistungen für unsere Kunden, einschließlich smarte Treibstoffsysteme, thermoplastische Verbund- und Verbundmetall-Hybridbatteriesysteme. Von leichten Batteriesystemen über hybride Treibstoffsysteme bis hin zu Reinigungssystemen für autonome Fahrzeuge kümmert sich Kautex um wegweisende Lösungen für das Zeitalter der neuen Mobilität.
Unsere Mitarbeiter sind Teil einer globalen Community, die sich dafür einsetzt, festgelegte und latente Kundenbedürfnisse zu erfüllen, dabei auf ein diverses Portfolio an Fähigkeiten zurückgreifen kann, Nachhaltigkeit zu einem Unterscheidungsmerkmal macht und sich der Diversität eines globalen, branchenübergreifenden führenden Unternehmens bewusst ist, in dem ein Arbeitsklima herrscht, in dem die Mitarbeiter dynamische Karrieren aufbauen können. Gemeinsam erfinden wir die Zukunft der Mobilität neu.
Contact details
-
- Stephanie McClung
- Manager, Content Marketing & Employer Brand
- stephanie.mcclung@kautex.com
Related insights
Caught in an F2 Tornado
The evening of August 24 was dark and rainy, but not unlike other rainy evenings in Windsor, Canada. And, once inside Kautex’s Windsor facility, between the rhythmic sound of the machines, the care...
CWC Celebrates 60 Years with Textron